Yes. All Dig-Tess (1-800-dig-tess) locates must be completed prior to beginning work.
In the project area, all wastewater, water, drainage, and City owned telecom facilities are to be ‘potholed’ at 100’ intervals, and at each crossing. Each service or lateral is to be uncovered at each crossing. Paint spotting is provided by the City of Grapevine. Potholing equipment, i.e. vac trucks, and repair is to be provided by the Contractor.
In the event a line cannot be identified by ordinary means in a timely manner, the City of Grapevine will identify said line at no charge to the contractor, but the repairs are at the expense of the Contractor.